Disadvantages of Hydroelectric power plant:

 

 

Disadvantages of Hydroelectric power plant:

  • Initial cost of the hydroelectric power plant is high and comparatively the returns are in low rates.
  • The annual report importance of this capital cost is a large part of the annual cost of hydropower installations.
  • The development period of hydro projects is moderately large.
  • The gap between the groundwork and achievement of a project may spread from 10 years to 15 years.
  • Power generation is reliant on the capacity of water available, which may vary from year to year and season to season.
  • If the rainfall is in-time and satisfactory, only then the reasonable operation from the plant can be anticipated.
  • Such plants are often far away from the load center and require long transmission lines to deliver power.
  • The charges of transmission lines and losses in them are more.
  • Large hydroelectric plants disturb the bio network of the zone, along deforestation, extinguishing plants and relocating people.
  • Production of such plants is a limiting factor.
  • The stress is now extra on mini, small and micro hydroelectric power stations

 

 

 

 

Comments